What Does the ASCEND ICC-ES Evaluation Report Establish?

The ASCEND ICC-ES Evaluation Report provides independent verification that ASCEND Composite Cladding complies with specific building code requirements when installed according to the manufacturer's published instructions. It helps architects, builders, code officials, and contractors understand where and how the product is recognized for code compliance—but it is not an installation guide or warranty document.

Technical Resource Guide

What Does the ASCEND ICC-ES Evaluation Report Establish?

One of the questions architects, contractors, builders, and code officials often ask is whether a new building product has been independently evaluated for building code compliance. For ASCEND Composite Cladding, that independent review is documented in an ICC-ES Evaluation Report (ESR-4143).

An ICC-ES Evaluation Report is not a marketing brochure or manufacturer warranty. Instead, it is an independent technical document that evaluates a product against applicable sections of the International Building Code (IBC) and International Residential Code (IRC). It provides building officials and design professionals with evidence that a product complies with specific code requirements when it is installed according to the conditions described in the report and the manufacturer's installation instructions.1

What the ICC-ES Report Does

It Establishes It Does Not Establish
Code compliance for evaluated applications A product warranty
Applicable code recognition Installation training
Approved conditions of use Unlimited design flexibility
Referenced testing and engineering Permission to ignore manufacturer instructions

What Is ICC-ES?

ICC Evaluation Service (ICC-ES) is an independent organization that evaluates construction products for compliance with model building codes. Evaluation reports are widely recognized by architects, engineers, building departments, and code officials throughout North America.

Rather than relying solely on manufacturer claims, ICC-ES reviews testing, engineering data, quality-control procedures, and other technical documentation before issuing an evaluation report.2

What Does ESR-4143 Cover?

The ASCEND ICC-ES Evaluation Report identifies the product, describes its construction, outlines the recognized applications, references the applicable building codes, and specifies the conditions under which the product complies with those codes.

It also references important installation requirements, approved substrates, fastening methods, design limitations, and applicable standards. Those provisions work together with the manufacturer's installation guide rather than replacing it.1

The Report Typically Includes

  • Applicable building codes
  • Product description
  • Recognized uses
  • Installation conditions
  • Referenced ASTM standards
  • Quality-control requirements
  • Code limitations and conditions

Why Contractors Should Care

Most homeowners never read an ICC-ES report, but contractors, architects, and building officials frequently rely on them during design and permitting. The report provides confidence that the product has undergone an independent technical review rather than relying only on marketing literature.

When questions arise during permitting or inspections, the evaluation report often serves as an important technical reference alongside the manufacturer's installation documentation.

The ICC-ES Report Is Only One Part of the Documentation

Although the evaluation report is an important technical resource, it is not the document installers should follow step by step during construction. Contractors should always use the current ASCEND Installation Guide for fastening schedules, clearances, flashing details, accessory requirements, and other installation procedures.3

Technical Documents Every Contractor Should Have

  • ☐ ICC-ES Evaluation Report
  • ☐ ASCEND Installation Guide
  • ☐ Technical Summary
  • ☐ Warranty documentation
  • ☐ Trim & Accessories Catalog
  • ☐ Applicable local building code requirements

Technical Resources From Suburban Wholesale & Supply

Suburban Wholesale & Supply helps contractors, builders, architects, and remodelers throughout Eastern Iowa and Western Illinois access the latest ASCEND technical resources before projects begin. We can help locate current evaluation reports, installation guides, technical summaries, warranty information, accessory catalogs, and product literature so you have the documentation needed for estimating, permitting, and ordering materials.

The Bottom Line

The ASCEND ICC-ES Evaluation Report establishes that the product has been independently evaluated for compliance with specific building code requirements under defined conditions of use. It provides valuable technical documentation for architects, contractors, and code officials, but it should always be used together with the manufacturer's current installation instructions and other published technical documents.

References

  1. ICC Evaluation Service. ESR-4143: ASCEND Composite Cladding. The evaluation report describes the product, recognized code compliance, approved conditions of use, referenced standards, and installation requirements applicable to ASCEND Composite Cladding. View ICC-ES Report ESR-4143 .
  2. ICC Evaluation Service. About ICC-ES Evaluation Reports. ICC-ES explains the purpose of evaluation reports and how they provide evidence of compliance with model building codes. Learn About ICC-ES Evaluation Reports .
  3. Associated Materials Innovations. ASCEND Composite Cladding Installation Guide. The installation guide provides the controlling instructions for wall preparation, flashing, fastening, accessories, clearances, and installation procedures required for ASCEND Composite Cladding. View the ASCEND Installation Guide .

We‘re here to help.

Suburban Wholesale & Supply works with contractors, remodelers, builders, and property professionals across Davenport, Bettendorf, Moline, Rock Island, and the wider Quad Cities. If What Does the ASCEND ICC-ES Evaluation Report Establish? affects a project you are pricing, our team can help compare product lines, confirm available options, and prepare a quote that fits the opening, exterior, or jobsite requirements.

Our counter and showroom teams support window, patio door, entry door, storm door, siding, trim coil, gutter protection, and accessory orders every week. We can talk through manufacturer differences, color and finish selections, installation details, lead times, and documentation so you can give your customer clear answers before the work begins.

For current availability, contractor pricing, product literature, or help matching this topic to a real project, contact Suburban Wholesale & Supply or send the details through our quote form. We will help you move from product research to an accurate material order with fewer surprises.

Share This Post

Share it on Facebook or X, or send it through your device share sheet for Instagram.

Call NowRequest A Quote